truck crane original spare parts list, including circuit breaker, water temperature sensor, solenoid valve, relay valve, air chamber, machine filter, diesel filter element, etc. |
road roller spare parts: filter element, oil filter element, electric device,such as six gang combination switch, Electric control handle, Monitor, Flash relay, etc. |
motor grader original spare parts list, including oil filter, fuel filter, air filter element, exchange filter, blade and other parts you need. |
excavator spare parts: track shoe, oil filter, diesel filter, air filter element, hydraulic return filter, hydraulic oil filter, hydraulic oil pilot filter, tooth, tooth pin, left tooth, right tooth, nuts, washer, bolt. |
wheel loader spare parts: composite hard gasket, air afterburner pump repair kit, work light bulb, blade, fuse box, fuel sensor, bucket teeth, gear assembly, air filter element, diesel filter, etc. |
Product Description
ADVANCE 385/95R25 1400R25 Reinforced Type GLB07
CHAO YANG 325/95R24 1200R24 Pattern CR926
ROADONE 315/80R22.5 Pattern GA26
Product name |
crane tires |
Place of Origin |
Xuzhou Province,China |
Type |
Crane tyres |
Delivery Time |
Within 20 Days |
Warranty |
2 years |
Certification |
ECE DOT ISO CCC GCC SASO SONCAP LATU |
Applications
1.Original packing
2.Factory Price,Let you have enough profit
3.high quality material, reliable and durable
4.In stock,quickdelivery We are a 15 Years of Experience Focus on spare parts,We have stock for famous machinery brand's
hot-selling every year,Quality Assurance,quick delivery
Packaging & Shipping
Company Profile
Certifications
FAQ
1 : Are you original manufacture?
A:Yes, we are an official leading manufacture in construction machinery in China and we have the wholeseries products you need.
2:What kind terms of payment can be accepted?
A:Normally we can work on T/T term or L/C term.
3:Which incoterms 2010 terms can we work?
A:Normally we work on FOB CFR CIF
4:What about the delivery time ?
A:7-30 days after receving the deposit.
5:What about the warranty time?
A:12 months after shipment or 2000 working hours
6.What about the Minimum Order Quantity?
A:The MOQ is 1 pcs.